40 SERIES GAUGE FITTING GUIDE
fitting guide
before installing check fitment on window frame, *note gauge pod may need to be trimmed before installing.
drill 3 to 4 mounting holes in gauge pod, 2 to 3 holes vertically alongside the gauge holes and 1 to 2 holes along the bottom arm.
after drilling the mounting holes in the gauge pod, sit the gauge holder along the window frame and with a texta mark out the holes.
with a 2.5mm drillbit, drill out mounting holes in window frame.
have your gauges handy to mount them in the holes before you stick the gauge up.
after mounting gauges in the holder, take off double sided tape covers and mount the gauge
once properly positioned and stuck down to window frame screw supplied screws into holder.
*note. yellow marks on gauge are recommended screw mounting points